Core Interior Works

Interior Turnkey Solutions in Dubai

One contract. One team. A finished space handed over ready to use.

Interior Turnkey Solutions in Dubai by Apple Wood UAE
Overview

A turnkey interior fit-out means you hand us an empty shell and receive back a space that is designed, built, tested and ready to open. Apple Wood UAE manages every step in between, from the first site survey in Dubai to the final snag list, so you deal with one team instead of coordinating designers, MEP contractors, joiners and suppliers yourself.

Our turnkey interior solutions suit offices, restaurants, retail units, clinics, gyms and private villas across Dubai, Abu Dhabi and Sharjah. Because design, engineering and construction sit under one roof, decisions are made faster, costs are clearer and the finished interior matches what was promised on the drawings.

Why choose a turnkey fit-out in Dubai?

Splitting a project between separate designers and contractors often creates gaps: drawings that cannot be built as drawn, MEP routes that clash with ceilings, or approval comments nobody owns. With a turnkey contract those gaps belong to us. Our designers produce drawings that our site teams and MEP engineers have already reviewed, so what you approve is what gets built.

You also get one programme and one budget. We prepare a detailed BOQ before work starts, agree milestones with you and report progress weekly with photos from site. If you need to open by a fixed date, such as a restaurant launch or a lease start, we plan the sequence backwards from that date and run trades in parallel where it is safe to do so.

Finally, a turnkey partner stays responsible after handover. We provide as-built drawings, warranties and operation manuals, and we remain your single point of contact for the defects liability period.

Our Process

From first call to handover

01

Site visit & brief

We survey the space, take measurements and agree your requirements, budget and timeline.

02

Design & BOQ

Drawings, material selections and a detailed bill of quantities so costs are clear upfront.

03

Approvals

We prepare submissions and secure authority and landlord approvals.

04

Execution

Our in-house teams deliver the works with weekly progress updates.

05

Testing & handover

Everything is tested, snagged and handed over with as-built documents.

FAQs

Interior Turnkey Solutions FAQs

Everything needed to make the space usable: design, approvals, MEP, civil and finishing works, joinery, lighting, signage, furniture and final cleaning. You receive the keys to a finished, tested space.

It depends on size and approvals. A small office or café can take 6 to 10 weeks including approvals, while a large villa or restaurant may take 3 to 6 months. We confirm a programme after the site survey.

Yes. We prepare the drawings and submissions for the relevant authorities and landlords, respond to comments and arrange inspections until completion certificates are issued.

Yes. We can integrate client-supplied furniture, equipment or finishes into the programme and coordinate their installation.

Get in Touch With Us

Schedule a consultation

Tell us about your space and we'll come back with ideas, a timeline and a clear quote. Site visits across Dubai, Abu Dhabi and Sharjah.

Call / WhatsApp+971 56 301 7676
VisitSama Residence, Block C, Dubai, UAE